Wednesday, October 7, 2009
As you can see from the photos we have some new shingles up and Hal Belanger and crew are starting the prep work for the outside painting. Very soon we should have new porch railings and the new roof should be completed in a few more days. We are waiting as well for the rear exterior doors to be installed. On the inside the walls are being prepped for painting.
Friday, September 18, 2009
We're coming along. Francisco Ramos and his crew of masons have finished our porch columns and pored us a new sidewalk on the south side of the house as well as a new concrete pad for our firescape. Hal and PT along with with Josh and Jeff have constructed the front deck, buildt the fire escape in the back along with an 8X8 deck for the lucky person renting 5053 1N. Hal tells me the front and rear porches will be done this week-end. We still need to install our fiberglass columns and build the steps in the front. The deck in the back needs a little more. It might be a little optimistic to have all this done by Monday. We'll see. Wrought iron railings will be put on the front porch in about two weeks. The backyard fence and new rear doors could be up next week.
Inside Mike the electrician put in a solid three days and he tells me he needs another two to finish the rough. Dave the plumber starts Monday and he expects to have his rough done in 4-5 days. Zach is assisting Mike and Dave. When the walls are ready for paint we'll start putting down the new hardwood floors. There is some light at the end of the tunnel. but remember the first rule of re-hab: expect the unexpected.
Sunday, September 13, 2009
Friday, September 4, 2009
Rough Start
Whoever said you needed to crack the eggs to make an omlete had in mind the rehab of 5053 Commonwealth. If you are wondering why you are still looking at pics of Fransisco and crew building the front porch it is because they are now building the porch for the third time. To refresh your memory the porch came down the first time because Fransisco put it up crooked in the rain and fog. He put it up crooked the next time in good weather. We also didn't like the fact that the grout lines were at least twice as large as the ones on the house itself. Rehabbing is the art of replicating the past. This porch did not look anything like the past. It was also wobbly. So down it came again. Now there are rods in the columns to keep it up, the grout lines are looking like those on the house and I think we finally have a winner. Fransisco to his credit does want to get it right. The garage and fire escape are down thanks to Hal Belanger and his crew. The glass block is in place around the basement windows thanks to Eric Moore of Grosse Pointe Glass Block. Nobody is coming through 5053 basement windows. Hal and PT, the carpenter, are ready to put up the new fire escape and build the front porch in the coming week.
Another little set back this week was discovering that the hardwood floors at 5053 are 3/4 inch which means they will not tolerate sanding. This is why they were covered with tile or carpet. I don't want tile or carpet in the living spaces. /though, we will be putting ceramic tile in the kitchens and bathrooms. So I have bit the bullet and purchased new hardwood for the first and second floors. I also needed to buy plywood so my new floors would be level and not squeak. We got a great price at Erickson's in Ferndale at $1.70 sq. ft. The third floor is pine. Nothing wrong with a pine floor.
After Labor day we will continue the tear down of the back porch,build the fire-escape and finish the front porch. Inside, Eugene will be working on the floors and Mario will be prepping walls on the 2nd and 3rd floors.
All in all a rough week for the re-hab of 5053 but we got through it and I am excited about what is going to happen next. Stay tuned. We are just getting started.
Monday, August 31, 2009
New Website!
Woodbridge Company would like to announce the launching of our redesigned website. Check it out at LiveInWoodbridge.com! I would like to thank everyone who has been involved in getting the site up and especially Melissa at Sherwood and Black who designed the site. Let us know what you think!
Saturday, August 29, 2009
Rain But Still Working
We were rained out yesterday. I went shopping for porch columns and decking materials. I also got hold of kitchen plans from Home Depot. I want apartment size appliances and home depot doesn't have them. I am waiting on Lowes and then i'll check in with my buddy Tony at ABC Warehouse. Even though it rained yesterday Fransisco put up the porch columns. They looked all out of whack. Fransisco said he couldn't see in the rain. He took them down today and rebuildt them. You can see they looked pretty good. We put the level to them and the bubble was in the middle. This is Fransisco's first job for me and looks like the real deal. Next week we should have the porch up, start the roof and start working on the floors inside.
Thursday, August 27, 2009
Working on The Porch
Getting ready for Fransisco Ramos to put up our new porch on Friday. I had to get rid of the yellow brick porch which stood out like a sore thumb against the common brick. More money but you need curb appeal. I want people that see this house say, "I would like to live there." Zach Platt brought a chain saw to take down the bushes in front of the porch. He will also do the plumbing so Fransisco will have the water he needs tomorrow. Dane,Donald and Brian did most of the tear-out. Dane has the contract to tear down the garage and ugly add-on at the back of the house. I want to secure the back before we tear down the garage. Waiting to put up steel replacement doors. Donald stays with his Aunt Irma just north of 5053 and Donald lives with his grandma across the street on Putnam. Brian's truck was invaluable. Fransisco showed up early to make sure the porch didn't collapse before he started work tomorrow.
Porch Down
Labels:
5053,
commonwealth,
detroit,
pictures,
porch,
rehab,
woodbridge
Wednesday, August 26, 2009